It’s not just muddy fields or sites in the open air that require SI work. Terra Firma (South) recently planned and undertook cable percussive drilling indoors. The works will enable pile design for a new mezzanine floor as part of an innovative office space development.
Our precision planning and liaison with our client and partners lead to a smooth operation in what could have otherwise been a tricky set-up. Employing algebraic calculations to model the arc of the rig, our team ensured that the site could be prepared with minimum disruption to enable the works.
The result- safe and easy mobilisation of the rig to the required spot, all works completed to schedule, reduced disruption to the indoor space, and delivery of our usual high standards to our client!
We pride ourselves on delivering the whole package to our clients- even when space is tight and there are mm to spare!
Recent Comments